Construction staking

Construction staking that matches the approved plans.

Once plans are approved, we set control and stakes so the crew can build walls, foundations, and utilities where the plan shows. We reply within 1 business hour, and you’ll get a written proposal the same day.

A surveyor drives wooden grade lath with pink and orange flagging while a colleague aims a total station on a building pad.

Staking is not a boundary survey and not a topo, though it often follows both. The input is the approved plan set and a clear list of what must be marked: buildings, curbs, utilities, or limits of work. We will not treat an outdated drawing as the staking plan. If the site has changed, or the plans have, tell us before we write the proposal.

Tell us about access, existing work on site, and your preferred window. The proposal names the scope and the field date after we review the plans and the site.

A surveyor ties pink flagging on a line of wooden lath across a graded building pad, green hills behind.

Every proposal is based on a records review of your property. We reply within 1 business hour.

Request a proposal

Get a same-day proposal

We reply within 1 business hour. Share the property and any documents; you’ll get a written proposal the same day.