SB 9 urban lot splits

SB 9 lot-split surveys: what the map has to cover.

An SB 9 urban lot split needs survey mapping that supports the city’s process on that parcel. Qualification is a planning question; we map the split. We reply within 1 business hour, and you’ll get a written proposal the same day.

An over-the-shoulder view of a surveyor at his desk reviewing CAD linework of a lot being split into two parcels by a dashed line.

SB 9 (the HOME Act) is a path for certain residential lots to split or add units under state rules. Cities still run a local process, and the survey map has to match what that process asks for: the existing lot, the proposed line, dimensions, and the record that controls the parcel. We do not tell an owner they qualify. We survey and map once they, or their planner, are on that path.

Volume is real but smaller than ADU permitting. San Jose has reported a growing number of SB 9 subdivision filings. That is one city’s figure, not a regional total, and not a reason to assume every lot in another city will follow the same count. SB 9 splits can still need a thorough boundary retracement before anyone draws a new line.

If a recorded map or a city filing is part of the work, those fees are billed on a separate line. The proposal will say what the map has to cover after we review the records.

A surveyor with a GNSS rover walks a line of pink-flagged stakes that divides an open grassy lot, with a colleague at a total station in the distance.

Every proposal is based on a records review of your property. We reply within 1 business hour.

Request a proposal

Not sure your lot was legally created? A Certificate of Compliance may be a first step.

Get a same-day proposal

We reply within 1 business hour. Share the property and any documents; you’ll get a written proposal the same day.