San Jose · Santa Clara County

Need a fence line or an ADU survey in San Jose?

We survey residential lots in San Jose for property lines, ADU and addition site plans, and SB 9 lot-split mapping. We reply within 1 business hour, and you’ll get a written proposal the same day.

A crew surveys an older San Jose ranch-house street, one at a total station in the driveway and the other flagging a corner with pink ribbon.

San Jose is a large, varied city: older grid lots in the core, hillside parcels, and newer neighborhoods toward the edges. A fence bid that says “verify the line,” a designer who cannot place an ADU without corners and grades, or an owner looking at an SB 9 split are the usual starting points. We begin with the address, the assessor parcel number if you have it, and what you want to build or mark.

The City of San Jose has reported a sharp rise in ADU building permits — from 10 in 2015 to 488 in 2024 — and a growing number of SB 9 filings. The city has also noted that a legally built house in San Jose may be eligible for up to three ADUs, and that ADUs may be sold as separate property. Those figures are the city’s, not a Survey My Land forecast. A pre-approved plan or a neighbor’s old map does not locate your corners; whether a survey appears on a permit checklist is a city question.

What we deliver depends on the job. A fence or boundary survey marks the line from deeds, maps, and monuments. An ADU or addition job is usually a topographic or existing-conditions survey the designer can use. An SB 9 split needs mapping that supports the city’s process — qualification itself is a planning question; we map the split. If a Record of Survey is required, that map is a separate deliverable, and Santa Clara County filing fees are billed on their own line.

A ranch-house lot plan with an attached garage and a dashed accessory unit in the back corner lies on an oak table beside a folding ruler and work gloves.

Every proposal is based on a records review of your property. We reply within 1 business hour.

Request a proposal

Get a same-day proposal

We reply within 1 business hour. Share the property and any documents; you’ll get a written proposal the same day.